Logo







An Advent Global Company

Premier at a Glance

Alliance News Channel:


Dice Facebook MySpace twitter

Job Postings

Technology Beehive

Social

Upgrade

An upgrade project typically consists of two major components. The technical and PeopleTools upgrade, designed to bring the existing databases to the same version. The Application upgrade, designed to convert business data to the upgraded version. During this process, any new or enhanced functionality, as well as eliminating obsolete processes is executed.

The Upgrade Process uses the RI+ methodology in its entirety, with differences occurring in Phase 5 and 6. Phase 5 and 6 are optionally implemented, depending upon the degree of enhancements.

The RI+ methodology consists of Eight Phases of a Peoplesoft Implementation / Upgrade Project.

The Upgrade Deliverables based on these phases are:

  • Phase 1: Pre-implementation Planning
    • Project Plan
    • Project Organization Chart
    • Implementation / Upgrade Strategy Document
    • Risk Analysis / mitigation Document
    • Project Scope Document
    • Infrastructure Analysis
  • Phase 2: Product Walkthroughs
    • Requirement Analysis Document
    • Application Feature Checklists
    • Table Setup Sequence
  • Phase 3: Fit / Gap Analysis (Transparent Training)
    • Detailed Fit / Gap Analysis
    • Detailed Requirement Specifications
    • Prototype / Proof of Concept (POC) Instance
  • Phase 4: Develop Baseline Functional Specifications
    • Baseline Functional Specifications
  • Phase 5: Vanilla implementation / Base Upgrade (Includes Testing)
    • Converted Database
    • Unit Testing and Integration Test Plans
    • Test Scenarios
  • Phase 6: Key Customizations
    • Customizations / Retro-Fitting as a result of the Fit / Gap Analysis
    • POC for enhancements
    • Upgrade dry-runs
  • Phase 7: Testing
    • Test Plans
    • Test Scripts
    • Performance Testing Strategy
    • Archival Strategy
    • Disaster Recovery Strategy
  • Phase 8: Go Live
    • Organization Readiness Document
    • Help Desk Procedures
    • Future Optimization document



Back To Services

Member Login

Good Evening Guest
Please Login

lock

  Sign Up

Resume

News and Events

Upcoming


Google G1 Phone

Message Icon 4

Fullstory
Clock Chris Gray - Oct 21, 2008 10:57:45am

Ubuntu 8.10

Message Icon 3

Fullstory
Clock Chris Gray - Oct 17, 2008 11:27:13am


Web 2.0

Message Icon 2

and beyond!

Fullstory
Clock Chris Gray - Oct 03, 2008 4:19:52pm

Old PostView All Upcoming (3)

Archives

Old PostView Full Archive (1)

Quick Access

Immigration Links

Immigration Support
US Citizenship

Frequently Used Links